Information from ship tracking data has shown that two tankers carrying LNG from Nigeria LNG (NLNG) are due to berth at Spanish regasification terminals today, according to Platts reports.
The 148,300 cu m LNG Imo vessel is due at Spain’s 11.8 Bcm/year Cartagena terminal, while the LNG Ogun with a capacity of 149,600 cu m is expected at the 7 Bcm/year Bilbao terminal, according to best estimates from Eclipse Energy, an analytics unit of Platts.
On 8th August 2015, the 156,000 cu m WilForce which also loaded a cargo at Nigeria LNG reached the 8.8 Bcm/year Sagunto terminal, Eclipse data indicated.
The two new confirmed arrivals will bring Spain’s total LNG imports so far this month to 960,000 cu m in eight cargoes, according to nominations from Spanish transmission system operator Enagas.
No comments:
Post a Comment